Privacy Notice

Welcome on BABLE

We put great importance to data protection and therefore use the data you provide to us with upmost care. You can handle the data you provide to us in your personal dashboard. You will find our complete regulations on data protection and clarification of your rights in our privacy notice. By using the website and its offers and navigating further, you accept the regulations of our privacy notice and terms and conditions.

Accept

Challenge / Goal

The aim of the use case is to provide a nearly CO2 neutral heat supply in Strijp-S, through replacing heat provision utility (gas) with one powered by renewable energy (biomass).

Solution

Standard & Technical Details: 2.5km of piping,  8.2 MW heat and 1.6 MW of electricity biomass plant.

The solution is changing steam pipes to district heating based on water as energy transmitter. The power is supplied via a biomass power plant owned by the municipality. Pipes can be used with any other water based heat production system. The biomass power plant is fueled by the waste of public green spaces.

Images


Want to learn more about the lessons learned, financial details and results?

Log in

Time period

Planning time: Less than 6 months

Implementation time: Less than 6 months

    Main benefits

  • Reducing use of fossils

  • Reducing GHG emissions

  • Increasing share of renewables

Something went wrong on our side. Please try reloading the page and if the problem still persists, contact us via support@bable-smartcities.eu
Action successfully completed!